The SchematicIssue 1
The Schematic, issue 1
This is the first issue of The Schematic, one email a month for architects at the start of projects. Three things, and then it stops.
01 · One thing we shipped
A site that follows one project
spacesync.ai is no longer one page. It is now Research, the Studios, Pricing, a Help center organized the way the app is, a blog and this newsletter, and every page follows the same project, the Northbank sample project, from the brief in to the presentation out.
The AI has a name, AIRA, and the site says what it does and that it is optional. The studios are five, in story order: SpaceStory, SpaceSheets, SpaceDesign, SpaceModule and SpaceShow. And there is one way in: a demo, followed by a 14-day free trial on every plan.
02 · One thing Northbank taught us
Write the count, not just the area
Northbank's brief asks for about 120 apartments: 40 one-bed, 60 two-bed, 20 three-bed. When we wrote the sample brief we nearly gave the residential program as an area alone, which is how many briefs arrive. We are glad we did not.
A count is what drifts first at the schematic stage. The two-beds grow because the plan wants them to, the one-beds shrink to compensate, and the total area still closes while the mix in the brief has quietly stopped being true. An area target hides that; a count target shows it. In SpaceSheets every line of the program carries both, each as a target and an achieved figure, with the delta beside them. The lesson is older than the product: put the count in the brief, and keep it where the model can read it.
03 · One thing worth reading
The RIBA Plan of Work
If you work in the UK you know it; if you do not, it is still the clearest public map of what an architecture project is made of, stage by stage, from Stage 0 to Stage 7. We build for the early stages, where the brief becomes a concept, and it is useful to have a shared name for that.
The overview is free to read on the RIBA site, and the stage descriptions are a good check on what a schematic-stage tool ought to hand to the stage after it.
That is the issue. The next one comes with the second act of the Northbank diary. Reply to this email if something in it was wrong or useful; a person reads the replies.
The SpaceSync team · SpaceSync by SOORU