Practice4 minute read

The gap between brief and model

Every project has a document that says what it should be and a model that says what it is. The schematic stage is the argument between them, and it is usually conducted through a spreadsheet that neither side reads.

By The SpaceSync team

Two documents, one project

The brief arrives as words. A client's email, an RFP, a page of counts: this many apartments in this mix, this much retail on the ground floor, parking for so many cars, an efficiency the developer will hold you to. The model arrives as geometry: a massing on a site, levels, a section that begins to look like a building.

Between them sits the program. It is the list of what the building has to contain, department by department, room by room, with a target area and a count against each line. It is the most important document at the schematic stage, and it is the one most likely to live in a file that the model has never heard of.

Where the gap opens

It opens in three places, and every studio will recognize all three.

  • Retyping. The brief is read, the program is typed into a spreadsheet, the spreadsheet is read again and the model is drawn from it. Each pass is a chance to lose a line, round a figure, or carry a count that the client revised in a later email.
  • Lag. The model moves faster than the sheet. A slab is pulled, a level is added, a department is moved to the podium, and the spreadsheet says what it said last Tuesday. Someone re-measures before the meeting; sometimes nobody does.
  • Ambiguity. Target and achieved live in different files. The brief says 1,500 square meters of retail; the model has whatever the ground floor turned out to be; the difference is discovered aloud, in front of the client.

None of these is a failure of care. They are what happens when the program is a document rather than a live part of the model, and when the only thing connecting the two is a person with two windows open.

What a closed gap looks like

The program has to be a thing the model reads, not a thing the model is checked against later. That is the whole design principle behind SpaceSheets, and it shows in the columns.

Every line of the program carries its identity (a name, a type, a department and its color, a priority), its location (from which level to which), and then the pair that matters: area and count, each as a target and an achieved figure, with net area the same way. Beside them sit the delta in area, the delta as a percentage, and a status. Target comes from the brief. Achieved comes from what has been drawn. The delta is not a calculation someone runs before a meeting; it is a column that is always there.

The program arrives in the sheet from AIRA's departments, so nothing is retyped from the brief, and the stacking arrives in SpaceDesign by drag and drop, so nothing is redrawn from the sheet. From there the two move together. Change a count in the sheet and its status changes; pull a slab in the model and the achieved area in the sheet follows. SpaceModule works on the same screen as SpaceDesign, so the walls, slabs and roofs that follow the massing are read the same way.

The sheet is still a sheet. There is a formula bar, there are comments on cells, there is the ribbon you expect, and you can add a column of your own. The difference is that the achieved column is fed by the model rather than by someone's memory of it.

What it changes in the room

Take the Northbank sample project, the mixed-use residential block we run through the whole product. The brief asks for about 120 apartments in three types, 40 one-bed, 60 two-bed and 20 three-bed, with 1,500 square meters of ground-floor retail and an efficiency of at least 78 percent. A unit mix like that is exactly the kind of thing that drifts: the two-beds grow because the plan wants them to, the one-beds are squeezed to compensate, and the count in the brief stops being true without anyone deciding it should.

With target and achieved on one screen, that drift is visible as it happens, as a delta with a status against it, and the conversation with the client changes shape. It stops being "we think it fits" and becomes "here is where it does not, and here is what we would trade to make it". The Metrics panel carries the same figures upward: floor areas and efficiency, program and occupancy, so the number the developer will ask for first is already on the screen.

The habit to build

Put the program where the model can read it, and treat the target column as the brief's voice in the room. Then the argument between the two documents is not lost in a spreadsheet; it is conducted line by line, in the open, at the stage where it is cheapest to settle.

See the program beside the model in the Design studio, or start where the departments come from, on Research.

See it in the product

Target and achieved, side by side, while the massing moves.

SpaceSheets holds the program; SpaceDesign draws it; the delta column is always there.

Bring a brief that has drifted. We put it beside the model.

A 30-minute walkthrough on your kind of project.

Or start on your own:Try SpaceSync

Not ready for a demo? The Schematic, one email a month.

More from the blog

  • Product

    What's new, first edition

    The first of a monthly note on what changed in SpaceSync. This one is longer than most, because it is the first: a new site, AIRA by name, five studios in story order, and how a studio gets in.

  • Northbank diary

    Northbank diary, act one

    Northbank is the sample project that runs through the whole product and every page of this site. This is the first entry: the brief, the site, and what we ask of AIRA before anything is drawn.

  • Research

    How AIRA builds an adjacency analysis

    One set of relationships between departments, drawn three ways: a matrix to audit it, a bubble diagram to argue with it, a stacking to check it can be built. And what AIRA needs before it starts.