How AIRA builds an adjacency analysis

Adjacency is the quiet part of the schematic stage. It rarely makes the presentation, and it decides most of what the presentation ends up showing.

By The SpaceSync team

Why adjacency comes before massing

Massing answers where the building sits. Adjacency answers what has to be next to what, and what must never be. Settle the second question and the first gets easier, because you already know that a residents' lobby cannot share a door with retail loading, that a daycare wants quiet and daylight, that parking sits under everything else. Leave it until a model exists and every correction costs a redraw.

The Northbank sample project, the mixed-use residential block we run through the whole product, is a good example of why. Retail at street level, amenities, apartments above, parking below: the tensions are in the brief before anything is drawn. Retail against residential entry. Amenities against noise. Parking access against the street frontage. An adjacency analysis is the first place those tensions are written down as decisions rather than worries.

What AIRA needs

Two inputs, and neither has to be finished. The site arrives as a polygon you draw on the map, or as a KML from your survey. The brief arrives as a prompt you type — a paragraph is enough — or as the RFP itself, uploaded for AIRA to read along with any documents you attach.

Give both and AIRA returns the project context, the departments and the adjacency. Give the brief alone and you still get departments and adjacency; the context waits until there is a site. AIRA is optional throughout, too: start with nothing and the dashboard is yours to fill in by hand.

Departments and rooms

An adjacency analysis needs something to relate. That something is the program: departments, each holding its rooms, and for every room a name, a department, a target area, a count and a priority. AIRA proposes them from the brief and checks them against the buildable envelope it derived from the site, so an overshoot is shown as an overshoot rather than quietly absorbed.

Priority earns more attention than it usually gets. It is what tells the analysis which relationship to protect when two of them pull in opposite directions, and on a mixed-use block they will pull.

The same analysis, three ways

AIRA works out one set of relationships between those departments, of three kinds. Direct: these must adjoin, by a shared wall, a shared door or a direct route. Indirect: proximity helps but contact is not required, so the same floor or a short walk will do. Restricted: these must be kept apart, for acoustic, hygienic, security or statutory reasons.

That single set is then drawn three ways, because each drawing answers a different question and nothing is recomputed between them. Change a relationship in one view and the other two are already showing it.

The matrix

The matrix is the audit. Every department against every other, the relationship sitting in the cell where the two meet. It is the view to read when you want to be certain nothing was missed, and the view to correct in when something is wrong, because a change here is unambiguous: one pair, one kind of relationship.

The bubble diagram

The bubble diagram is the argument. Departments become circles sized by their area, relationships become the links between them, and the shape of the scheme appears before a wall does. Drag a bubble and you are testing a proposition about the plan, not moving a drawing.

Vertical stacking

Vertical stacking is the reality check. It puts departments on levels and catches the scheme that cannot be built while it is still a diagram: the amenity that has landed above the apartments it was meant to serve, the loading with nowhere to arrive. On a project like Northbank, where parking, retail, podium amenities and apartments each want their own band, this is where the section begins to exist.

Review, then accept

None of it takes effect on its own. A proposal arrives with a review chip and waits. You read it, you change what is wrong — any area, any count, any relationship — and your changes are recorded as overrides, so it stays clear which figure came from the brief, which was measured from the site and which is yours.

Then you accept. The proposal becomes the record for that step and unlocks the next, and accepted work survives a later re-run. AIRA drafts; the architect decides. That is the whole arrangement, and it is the reason the adjacency you carry into the next meeting is one you can defend line by line.

Where it goes next

An accepted analysis is not a picture to file. The departments arrive in SpaceSheets as the live program with their targets, where target against achieved starts to mean something. The stacking arrives in SpaceDesign, where the program blocks land on the site and massing begins from a scheme that already obeys its own rules. Nothing is retyped between the two.

See the analysis in the product on the Research page, or follow it into the Design studio.

See it in the product

The matrix, the bubble diagram and the stacking, on a real plot.

Research is where AIRA turns a site and a brief into context, departments and adjacency.

Bring a site and a brief. We run the research live.

A 30-minute walkthrough on your kind of project, adjacency included.

Or start on your own:Try SpaceSync

Not ready for a demo? The Schematic, one email a month.

More from the blog

  • Product

    What's new, first edition

    The first of a monthly note on what changed in SpaceSync. This one is longer than most, because it is the first: a new site, AIRA by name, five studios in story order, and how a studio gets in.

  • Northbank diary

    Northbank diary, act one

    Northbank is the sample project that runs through the whole product and every page of this site. This is the first entry: the brief, the site, and what we ask of AIRA before anything is drawn.

  • Practice

    The gap between brief and model

    Every project has a document that says what it should be and a model that says what it is. The schematic stage is the argument between them, and the program is where it is usually lost.